The study was conducted in 2012 and is available at the Irrigation Research Foundation www.irf-info.com....
Download White Paper Here Even with BNR, denitrification can be challenging when the plants are underloaded for flow as well as biological or biochemical oxygen demand (BOD) and perhaps chemical oxygen demand (COD). Denitrification is inhibited by a lack of available...
Lagoon System 0.01 MGD Municipalities using lagoon systems for wastewater treatment are often challenged with accumulating solids in their treatment ponds. Municipal wastewater carries high organic substrate loads that can inhibit proper wastewater processing....
One of the most persistent challenges in lagoon wastewater treatment is solids (sludge) management. Lagoon systems are designed to reduce organic solids during wastewaterprocessing. Built up sludge is typically dredged from lagoon systems with heavy equipment. Once...
Collection System 0.02 MGD Publicly owned treatment works (POTWs) receiving wastewater from industrial sources often experience treatment complications from high biological oxygen demand (BOD5) and total suspended solids (TSS) loads. Establishing an...
Industrial Food & Beverage Wastewater Treatment Plant 0.01 MGD Wastewater treatment plants processing industrial wastewater are often challenged with high biological oxygen demand (BOD) and total suspended solids (TSS)loadings. Specifically, wastewater byproducts...